as-built drawing services
We provide accurate residential as-built drawings for homes, additions, remodels, and existing properties. Our team carefully measures and documents current site conditions to produce detailed floor plans, elevations, and architectural drawings for design, permitting, renovation, and real estate purposes.



From concept to permit-ready drawings for every type of multifamily project
Compare Our As-Built Drawing Services in Los Angeles
Not sure which as-built drawing service fits your Los Angeles project? The table below breaks down what's included, typical turnaround, and when each service applies, whether you're a homeowner planning an ADU, a contractor handling a tenant improvement, or a facility manager documenting an industrial site.
| Service Type | What's Included | Common Project Types | Deliverable Format | Typical Turnaround | Ideal For |
|---|---|---|---|---|---|
| Residential As-Builts | Floor plans, elevations, and site plans for SFD/MFD homes | ADUs, garage conversions, kitchen remodels, room additions | AutoCAD, Revit, PDF | 3–5 business days | Homeowners and architects preparing LADBS submittals |
| Commercial As-Builts | Tenant improvement drawings, space planning, lease exhibits | Retail buildouts, restaurant conversions, office relocations | AutoCAD, Revit, PDF | 5–7 business days | Property managers, tenants, and general contractors |
| Industrial As-Builts | Existing-condition drawings for warehouses and manufacturing facilities | Facility expansions, equipment installs, ownership transfers | AutoCAD, Revit, PDF, 3D scan data | 7–10 business days | Facility managers and industrial property owners |
Turnaround times are estimates based on typical project scope and may vary depending on property size and site access. Contact us for a project-specific timeline.
FAQ
Frequently asked questions
Everything you need to know about getting accurate as-built drawings for your project. Still have questions?
How long does it take to get as-built drawings in Los Angeles?
Most residential as-built drawing sets are completed within 3 to 5 business days, while commercial and industrial projects typically take 5 to 10 business days depending on the size and complexity of the property.
Do I need as-built drawings for an ADU permit with LADBS?
Yes. LADBS requires accurate existing-condition drawings before approving any ADU application, including current floor plans, elevations, and site layout. This ensures the proposed structure is reviewed against what actually exists on the property today.
What's the difference between residential, commercial, and industrial as-built services?
Residential as-built drawings focus on single-family and multi-family homes, ADUs, and garage conversions. Commercial as-built services cover tenant improvements, retail spaces, and office buildouts. Industrial as-built drawings document warehouses, manufacturing facilities, and larger structural systems.
Can you provide as-built drawings if no original plans exist?
Yes. Using laser measurement and on-site field verification, we can generate a complete and accurate as-built drawing set even when no prior plans or permits are on file, which is common for older Los Angeles properties.
Free Estimate